{"id":6391,"date":"2026-05-19T08:23:38","date_gmt":"2026-05-19T08:23:38","guid":{"rendered":"https:\/\/techartstav.cz\/?p=6391"},"modified":"2026-05-19T08:37:43","modified_gmt":"2026-05-19T08:37:43","slug":"renovation-of-the-industrial-high-school-in-krnov-from-remediation-to-full-operation-of-the-locker-rooms","status":"publish","type":"post","link":"https:\/\/techartstav.cz\/en\/renovation-of-the-industrial-high-school-in-krnov-from-remediation-to-full-operation-of-the-locker-rooms\/","title":{"rendered":"Renovation of the Industrial High School in Krnov: From Remediation to Full Operation of the Locker Rooms"},"content":{"rendered":"\n<p><strong>While the contractors are putting the finishing touches on the project, the students have already returned to the renovated locker rooms, which have undergone a complete technological upgrade.<\/strong><\/p>\n\n\n\n<p>Following <strong><a href=\"https:\/\/techartstav.cz\/en\/reconstruction-of-the-secondary-school-of-industry-in-krnov-after-the-floods\/\" data-type=\"link\" data-id=\"https:\/\/techartstav.cz\/en\/reconstruction-of-the-secondary-school-of-industry-in-krnov-after-the-floods\/\">the first phase<\/a><\/strong> of restoration and mud removal, work in recent weeks has focused on finishing touches and installations. The priority was to reopen those parts of the school that are essential for the daily operations of hundreds of students.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>More durable materials and modern standards<\/strong><\/h2>\n\n\n\n<p>The renovation was not merely a matter of restoring the building to its original condition. As part of the renovation, techniques were implemented in high-traffic areas of the school\u2014particularly in the locker rooms and utility rooms\u2014to enhance the structural integrity of the building.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Masonry restoration: <\/strong>Extensive work was carried out on the walls to ensure optimal drying and future vapor permeability.<\/li>\n\n\n\n<li><strong>New flooring systems:<\/strong> The flooring in the locker rooms was selected for its durability and ease of maintenance.<\/li>\n\n\n\n<li><strong>Installation:<\/strong> The plumbing systems that had been damaged by water were inspected and repaired.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>The locker rooms are fully operational<\/strong><\/h2>\n\n\n\n<p>The locker rooms are the first major area that the school has begun to use fully again. For students, this means an end to makeshift solutions and a return to the normal routine they were accustomed to. These facilities are now fully operational, which has allowed for the smooth continuation of both classroom and hands-on instruction in other parts of the building.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Final countdown until submission<\/strong><\/h2>\n\n\n\n<p>The project is currently in the so-called \u201cfinishing phase.\u201d This primarily involves cosmetic touches, trim work, minor painting, and a final cleanup of all affected areas. The TechArtStav team is now preparing all the documentation for the handover of the building.<\/p>\n\n\n\n<p>The speed with which the school was restored to full operation is the result of coordinated efforts and a clearly defined schedule. The Krnov Technical High School has thus once again demonstrated its role as a stable educational institution capable of successfully weathering the aftermath of a natural disaster.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large is-style-default\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.44.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"6383\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.44-768x1024.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6383\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.44-768x1024.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.44-225x300.jpeg 225w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.44-1152x1536.jpeg 1152w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.44.jpeg 1536w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"6381\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-768x1024.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6381\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-768x1024.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-225x300.jpeg 225w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1152x1536.jpeg 1152w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45.jpeg 1536w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"6379\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1-768x1024.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6379\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1-768x1024.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1-225x300.jpeg 225w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1-1152x1536.jpeg 1152w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-1.jpeg 1536w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"6377\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2-1024x768.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6377\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2-1024x768.jpeg 1024w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2-300x225.jpeg 300w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2-768x576.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2-1536x1152.jpeg 1536w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-2.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"6375\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3-1024x768.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6375\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3-1024x768.jpeg 1024w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3-300x225.jpeg 300w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3-768x576.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3-1536x1152.jpeg 1536w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-3.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"6373\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4-1024x768.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6373\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4-1024x768.jpeg 1024w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4-300x225.jpeg 300w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4-768x576.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4-1536x1152.jpeg 1536w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-4.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"6371\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5-1024x768.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6371\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5-1024x768.jpeg 1024w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5-300x225.jpeg 300w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5-768x576.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5-1536x1152.jpeg 1536w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-5.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"6369\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6-1024x768.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6369\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6-1024x768.jpeg 1024w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6-300x225.jpeg 300w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6-768x576.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6-1536x1152.jpeg 1536w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-6.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-7.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"6367\" src=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-7-768x1024.jpeg\" alt=\"Technick\u00e1 obnova S\u0160 pr\u016fmyslov\u00e9 v Krnov\u011b\" class=\"wp-image-6367\" srcset=\"https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-7-768x1024.jpeg 768w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-7-225x300.jpeg 225w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-7-1152x1536.jpeg 1152w, https:\/\/techartstav.cz\/app\/uploads\/2026\/05\/WhatsApp-Image-2026-04-15-at-11.25.45-7.jpeg 1536w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">Renovation of the Industrial High School in Krnov<\/figcaption><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Krnov Technical High School has the hardest part behind it. The renovation of the damaged sections of the building has reached the stage just before the completed work is handed over.<\/p>\n","protected":false},"author":5,"featured_media":6370,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[30],"tags":[],"class_list":["post-6391","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-work"],"acf":[],"_links":{"self":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/posts\/6391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/comments?post=6391"}],"version-history":[{"count":2,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/posts\/6391\/revisions"}],"predecessor-version":[{"id":6393,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/posts\/6391\/revisions\/6393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/media\/6370"}],"wp:attachment":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/media?parent=6391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/categories?post=6391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/tags?post=6391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}