{"id":5054,"date":"2021-05-05T13:56:00","date_gmt":"2021-05-05T13:56:00","guid":{"rendered":"https:\/\/techartstav.cz\/?post_type=realizace&#038;p=5054"},"modified":"2024-05-29T12:05:38","modified_gmt":"2024-05-29T12:05:38","slug":"club-zubri","status":"publish","type":"realizace","link":"https:\/\/techartstav.cz\/en\/realizations\/club-zubri\/","title":{"rendered":"Club Zub\u0159\u00ed"},"content":{"rendered":"\n<p><strong>Realizace:<\/strong>\u00a02021<br><strong>Investor:<\/strong>\u00a0City of Zub\u0159\u00ed<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Elaboration of PD Reconstruction of the interior of the Zub\u0159\u00ed club.<\/h2>\n\n\n\n<p>Acquisition of project documentation in the scope of architectural and construction, spatial acoustics, air conditioning, mechanical technology, high-current installation, low-current installation, video projection according to DCI standards, electroacoustics.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Elaboration of PD Reconstruction of the interior of the Zub\u0159\u00ed club.<\/p>\n","protected":false},"featured_media":4440,"parent":0,"template":"","typy-realizaci":[31],"class_list":["post-5054","realizace","type-realizace","status-publish","has-post-thumbnail","hentry","typy-realizaci-theatre-technologies"],"acf":[],"_links":{"self":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/realizace\/5054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/realizace"}],"about":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/types\/realizace"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/media\/4440"}],"wp:attachment":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/media?parent=5054"}],"wp:term":[{"taxonomy":"typy-realizaci","embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/typy-realizaci?post=5054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}