{"id":5079,"date":"2019-05-22T11:41:00","date_gmt":"2019-05-22T11:41:00","guid":{"rendered":"https:\/\/techartstav.cz\/?post_type=realizace&#038;p=5079"},"modified":"2024-05-29T13:59:18","modified_gmt":"2024-05-29T13:59:18","slug":"realisations-from-2013-to-2019","status":"publish","type":"realizace","link":"https:\/\/techartstav.cz\/en\/realizations\/realisations-from-2013-to-2019\/","title":{"rendered":"Realisations from 2013 to 2019"},"content":{"rendered":"\n<p>We have accomplished a lot in this time. Here they are listed:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">OC Galerie Ostrava &#8211; T\u0159ebovice<\/h2>\n\n\n\n<p>Reconstruction of a commercial unit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">RD Ostrava &#8211; Lhotka<\/h2>\n\n\n\n<p>Reinforcement of the area, facade of the house, construction of retaining walls, fencing , HTU, JT\u00da.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Repair of lighting in TJ Sokol Poruba<\/h2>\n\n\n\n<p>Replacement of light sources in the gym of TJ Sokol Poruba, switching to energy-saving and more efficient LED technology.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Michal Mine &#8211; connection of three socket cabinets with electrical metering<\/h2>\n\n\n\n<p>Supply and installation of three large capacity socket cabinets with electrical metering, including new cabling.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Puppet Theatre Ostrava &#8211; AV technology<\/h2>\n\n\n\n<p>Complete supply and installation of AV components for digital audio and video technology for the main hall of the Puppet Theatre in Ostrava.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Tren\u010d\u00edn<\/h2>\n\n\n\n<p>Supply of steel structure for new HVAC and refrigeration units.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Ostrava &#8211; Hrabov\u00e1<\/h2>\n\n\n\n<p>Reconstruction of entrances to the hypermarket.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Theatre Arena &#8211; box office projection<\/h2>\n\n\n\n<p>Assembly, installation and delivery of projector, including bracket for effect projection on the floor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Ostrava &#8211; Hrabov\u00e1<\/h2>\n\n\n\n<p>Rehabilitation of the parking lot and facade.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Community centre Mich\u00e1lkovice<\/h2>\n\n\n\n<p>Complete equipment of classroom with computer equipment, electronics, projector including screen, sound system and AV equipment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Karvin\u00e1<\/h2>\n\n\n\n<p>Rehabilitation of the car park.<\/p>\n\n\n\n<p>Reconstruction and extension of the barn in the Chvalsk\u00e1 tvrz area<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Fr\u00fddek &#8211; M\u00edstek<\/h2>\n\n\n\n<p>Rehabilitation of the car park.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Projection screen summer cinema Orlov\u00e1<\/h2>\n\n\n\n<p>Installation of a projection screen in the Orlov\u00e1 summer cinema.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Fr\u00fddek &#8211; M\u00edstek<\/h2>\n\n\n\n<p>Pylon &#8211; demolition of the original advertising pylon, delivery and installation of a new pylon.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Centre for Joint Activities Jesen\u00edk<\/h2>\n\n\n\n<p>Supply and installation of room acoustics and complete fabric equipment. Implementation date: 2019<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Peace Cinema in Opava<\/h2>\n\n\n\n<p>Supply and installation of electrical wiring, digital projection technology, stage lighting, sound system, stage fabric equipment, acoustic lining of the hall and seats. Date of realization: 2018<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">OC Galerie Ostrava &#8211; T\u0159ebovice<\/h2>\n\n\n\n<p>Emergency repair of the main water supply.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">KD Lan\u0161kroun<\/h2>\n\n\n\n<p>Supply of steel structures for movable acoustic cladding above the stage. Date of realization: 2018<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">OC Galerie Ostrava &#8211; T\u0159ebovice<\/h2>\n\n\n\n<p>Rehabilitation of the basement walls of the building &#8211; demolition works.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Renovation of the cultural hall in \u0158epi\u0161t\u011b<\/h2>\n\n\n\n<p>Supply and installation of stage equipment, fabric equipment, stage lighting including video projection and AV equipment. Date of implementation: from 02\/2018<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ostrava Museum<\/h2>\n\n\n\n<p>Servicing and adjustment of exhibition lighting. Date of implementation: 08\/2016 &#8211; ongoing<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DDM Vratimov<\/h2>\n\n\n\n<p>Supply and installation of stage lighting, supply and installation of stage technology, including fabric equipment. Date of realization: 06\/2016<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tesco Ostrava-Hrabov\u00e1<\/h2>\n\n\n\n<p>Repairs of partition walls and columns, repairs of SDK walls and ceilings in commercial units, rehabilitation of the facade wall.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hypermarket Tesco Fr\u00fddek &#8211; M\u00edstek<\/h2>\n\n\n\n<p>Rehabilitation of walls, partitions and steel structures, rehabilitation of floors and facade walls.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">OC Galerie Ostrava &#8211; T\u0159ebovice<\/h2>\n\n\n\n<p>Repair of bituminous cover of the car park, new concrete cover of the bus stop.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DDM T\u0159inec<\/h2>\n\n\n\n<p>Complete replacement of fabric equipment on the stage modification of the stage machinery structures, horizon track and stage side covers Date of implementation: 10\/2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Prun\u00e9\u0159ov Power Plant II.<\/h2>\n\n\n\n<p>Supply and installation of thermal insulation of the internal connecting pipe of unit C. Date of execution: 12\/2014 &#8211; 2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">KD Ostro\u017esk\u00e1 Nov\u00e1 Ves<\/h2>\n\n\n\n<p>Supply and installation of stage equipment including fabric equipment, stage lighting and AV equipment. Date of realization: 12\/2016 &#8211; 07\/2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DISK Theatre (DAMU), Prague<\/h2>\n\n\n\n<p>Supply and installation of acoustic wall and ceiling tiles in the main hall and stage lighting technology. Date of realization: 06-08\/2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Puppet Theatre Ostrava<\/h2>\n\n\n\n<p>Supply and installation of video distribution systems for video projection. Date of realization: 06\/2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">My\u0161l\u00edn &#8211; private projection hall<\/h2>\n\n\n\n<p>Supply and installation of acoustic wall and ceiling tiles, curtain machinery, fabric equipment and room blackout. Date of execution: 05-06\/2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mourning hall Pet\u0159vald<\/h2>\n\n\n\n<p>Supply and installation of complete sound system. Date of completion: 05\/2017<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kozlovice, okr. Fr\u00fddek &#8211; M\u00edstek<\/h2>\n\n\n\n<p>A system of ponds, including the intake facility, revitalisation of the riverbed and modifications of the riverbed under the bridge structure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">KD M\u011b\u0159\u00edn<\/h2>\n\n\n\n<p>Supply and installation of stage lighting, stage technology, fabric equipment and AV equipment. Date of implementation: 04\/2016 &#8211; 09\/2016<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SV\u010c Korunka<\/h2>\n\n\n\n<p>Modification and addition of AV equipment. Date of realization: 11\/2016<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">KD Fren\u0161t\u00e1t p. Radho\u0161t\u011bm<\/h2>\n\n\n\n<p>Supply and installation of stage technology including fabric equipment. Date of realization: 12\/2016<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kindergarten Pet\u0159vald<\/h2>\n\n\n\n<p>Supply and installation of acoustic tiles, including project documentation. Date of completion: 08\/2016<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">HM Tesco Ostrava &#8211; Hrabov\u00e1<\/h2>\n\n\n\n<p>Rehabilitation of walls, partitions and steel structures.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ZU\u0160 Z\u00e1b\u0159eh na Morav\u011b<\/h2>\n\n\n\n<p>Supply and installation of stage lighting. 11\/2013 &#8211; 06\/2014<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Heat pump Na Pu\u010d\u00e1lce, Prague 6<\/h2>\n\n\n\n<p>Construction of 3 geothermal boreholes, each 120 m long and 150 mm in diameter, including equipment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tesco Ostrava &#8211; T\u0159ebovice<\/h2>\n\n\n\n<p>repair of partition and column failures and repair of SDK walls and ceilings in commercial units repair of sewage system of commercial units repair of interlocking pavement in underground car park Date of execution: 09\/2014 &#8211; 11\/2014<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cultural House A\u0161<\/h2>\n\n\n\n<p>Supply and installation of fabric equipment. Realized: 12\/2014<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">T\u011b\u0161\u00edn Theatre in \u010cesk\u00fd T\u011b\u0161\u00edn<\/h2>\n\n\n\n<p>Supply and installation of 7 lifting platforms for the stage of the Small Stage. Date of realization: 11\/2013 &#8211; 06\/2014<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Realisations from 2013 to 2019<\/p>\n","protected":false},"featured_media":4422,"parent":0,"template":"","typy-realizaci":[],"class_list":["post-5079","realizace","type-realizace","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/realizace\/5079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/realizace"}],"about":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/types\/realizace"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/media\/4422"}],"wp:attachment":[{"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/media?parent=5079"}],"wp:term":[{"taxonomy":"typy-realizaci","embeddable":true,"href":"https:\/\/techartstav.cz\/en\/wp-json\/wp\/v2\/typy-realizaci?post=5079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}