We have accomplished a lot in this time. Here they are listed:

OC Galerie Ostrava – Třebovice

Reconstruction of a commercial unit.

RD Ostrava – Lhotka

Reinforcement of the area, facade of the house, construction of retaining walls, fencing , HTU, JTÚ.

Repair of lighting in TJ Sokol Poruba

Replacement of light sources in the gym of TJ Sokol Poruba, switching to energy-saving and more efficient LED technology.

Michal Mine – connection of three socket cabinets with electrical metering

Supply and installation of three large capacity socket cabinets with electrical metering, including new cabling.

Puppet Theatre Ostrava – AV technology

Complete supply and installation of AV components for digital audio and video technology for the main hall of the Puppet Theatre in Ostrava.

Hypermarket Tesco Trenčín

Supply of steel structure for new HVAC and refrigeration units.

Hypermarket Tesco Ostrava – Hrabová

Reconstruction of entrances to the hypermarket.

Theatre Arena – box office projection

Assembly, installation and delivery of projector, including bracket for effect projection on the floor.

Hypermarket Tesco Ostrava – Hrabová

Rehabilitation of the parking lot and facade.

Community centre Michálkovice

Complete equipment of classroom with computer equipment, electronics, projector including screen, sound system and AV equipment.

Hypermarket Tesco Karviná

Rehabilitation of the car park.

Reconstruction and extension of the barn in the Chvalská tvrz area

Hypermarket Tesco Frýdek – Místek

Rehabilitation of the car park.

Projection screen summer cinema Orlová

Installation of a projection screen in the Orlová summer cinema.

Hypermarket Tesco Frýdek – Místek

Pylon – demolition of the original advertising pylon, delivery and installation of a new pylon.

Centre for Joint Activities Jeseník

Supply and installation of room acoustics and complete fabric equipment. Implementation date: 2019

Peace Cinema in Opava

Supply and installation of electrical wiring, digital projection technology, stage lighting, sound system, stage fabric equipment, acoustic lining of the hall and seats. Date of realization: 2018

OC Galerie Ostrava – Třebovice

Emergency repair of the main water supply.

KD Lanškroun

Supply of steel structures for movable acoustic cladding above the stage. Date of realization: 2018

OC Galerie Ostrava – Třebovice

Rehabilitation of the basement walls of the building – demolition works.

Renovation of the cultural hall in Řepiště

Supply and installation of stage equipment, fabric equipment, stage lighting including video projection and AV equipment. Date of implementation: from 02/2018

Ostrava Museum

Servicing and adjustment of exhibition lighting. Date of implementation: 08/2016 – ongoing

DDM Vratimov

Supply and installation of stage lighting, supply and installation of stage technology, including fabric equipment. Date of realization: 06/2016

Tesco Ostrava-Hrabová

Repairs of partition walls and columns, repairs of SDK walls and ceilings in commercial units, rehabilitation of the facade wall.

Hypermarket Tesco Frýdek – Místek

Rehabilitation of walls, partitions and steel structures, rehabilitation of floors and facade walls.

OC Galerie Ostrava – Třebovice

Repair of bituminous cover of the car park, new concrete cover of the bus stop.

DDM Třinec

Complete replacement of fabric equipment on the stage modification of the stage machinery structures, horizon track and stage side covers Date of implementation: 10/2017

Prunéřov Power Plant II.

Supply and installation of thermal insulation of the internal connecting pipe of unit C. Date of execution: 12/2014 – 2017

KD Ostrožská Nová Ves

Supply and installation of stage equipment including fabric equipment, stage lighting and AV equipment. Date of realization: 12/2016 – 07/2017

DISK Theatre (DAMU), Prague

Supply and installation of acoustic wall and ceiling tiles in the main hall and stage lighting technology. Date of realization: 06-08/2017

Puppet Theatre Ostrava

Supply and installation of video distribution systems for video projection. Date of realization: 06/2017

Myšlín – private projection hall

Supply and installation of acoustic wall and ceiling tiles, curtain machinery, fabric equipment and room blackout. Date of execution: 05-06/2017

Mourning hall Petřvald

Supply and installation of complete sound system. Date of completion: 05/2017

Kozlovice, okr. Frýdek – Místek

A system of ponds, including the intake facility, revitalisation of the riverbed and modifications of the riverbed under the bridge structure.

KD Měřín

Supply and installation of stage lighting, stage technology, fabric equipment and AV equipment. Date of implementation: 04/2016 – 09/2016

SVČ Korunka

Modification and addition of AV equipment. Date of realization: 11/2016

KD Frenštát p. Radhoštěm

Supply and installation of stage technology including fabric equipment. Date of realization: 12/2016

Kindergarten Petřvald

Supply and installation of acoustic tiles, including project documentation. Date of completion: 08/2016

HM Tesco Ostrava – Hrabová

Rehabilitation of walls, partitions and steel structures.

ZUŠ Zábřeh na Moravě

Supply and installation of stage lighting. 11/2013 – 06/2014

Heat pump Na Pučálce, Prague 6

Construction of 3 geothermal boreholes, each 120 m long and 150 mm in diameter, including equipment.

Tesco Ostrava – Třebovice

repair of partition and column failures and repair of SDK walls and ceilings in commercial units repair of sewage system of commercial units repair of interlocking pavement in underground car park Date of execution: 09/2014 – 11/2014

Cultural House Aš

Supply and installation of fabric equipment. Realized: 12/2014

Těšín Theatre in Český Těšín

Supply and installation of 7 lifting platforms for the stage of the Small Stage. Date of realization: 11/2013 – 06/2014

Do you want more information or inquire directly?

Implementation

Here you will find our work in the field of theatre technology, renovation of cultural facilities and construction projects that we have completed in recent years.